OEE Improvement
Maximize equipment availability, performance rate, and quality output on critical assets.
Expected Financial Impact:
The Operational Bottleneck
Low equipment availability due to breakdowns, minor stoppages, speed losses, and quality rejects keeps OEE trapped between 40-60%.
Common Floor Challenge:
Our Floor Implementation Approach
We follow a rigorous, hands-on methodology to execute changes on your lines. Here is exactly what we do:
- 1Step 1: Install standardized OEE data capture and loss categorization framework.
- 2Step 2: Conduct 6 Big Losses analysis to pinpoint major downtime contributors.
- 3Step 3: Deploy Autonomous Maintenance (AM) and Planned Maintenance (PM) pillars.
- 4Step 4: Execute SMED (Single-Minute Exchange of Die) setup time reduction projects.
- 5Step 5: Institutionalize Root Cause Analysis (RCA) and 5-Why problem solving.
Packaging Case Study
OEE & Quick Changeover Optimisation
Financial Impact:
High-runner extrusion film lines lost 12+ hours per die changeover due to disorganized tool preparation and unstandardized procedures.
Engineering Case Study
CNC Setup & Spindle Optimisation
Financial Impact:
Custom machining shop lost 35% of CNC machine capacity to batch setup delays, fixture zero-setting, and CMM inspection waits.