Case StudiesEngineering
Engineering Industry

CNC Setup & Spindle Optimisation

Engineering CNC Setup & Spindle Optimisation
Primary Outcome22% Spindle Utilization Uplift

Business Challenge

Custom machining shop lost 35% of CNC machine capacity to batch setup delays, fixture zero-setting, and CMM inspection waits.

Client Situation & Operational Bottlenecks:

  • Machinists spending up to 3 hours per batch locating tooling and fixtures
  • Manual trial-and-error part alignment on 24 CNC machining centers
  • Frequent delays waiting for CMM quality approval on first-off parts
  • Low spindle utilization (54%) resulting in missed customer dispatch dates

Our Approach

  • Conducted setup time analysis across high-precision CNC machining centers
  • Introduced zero-point modular quick-clamping fixtures for instant part location
  • Established offline tool presetting routines to prepare tooling before machine stops
  • Standardized tooling carousels and visual setup instruction sheets
  • Implemented quick first-off part inspection protocols with dedicated gauge kits

Key Improvement Initiatives

  • 1
    Equipped 24 CNC machines with standardized zero-point baseplates
  • 2
    Set up a centralized tool presetting room for offline tool measurement
  • 3
    Created visual setup binder checklists for all high-frequency part numbers
  • 4
    Trained machinists on standardized SMED setup procedures

Before vs. After Operational Metrics

MetricBefore TransformationAfter TransformationQuantified Impact
Average CNC Setup Time180 min111 min-38%
Spindle Utilization Rate54%76%+22%
On-Time Dispatch Adherence78%96%+18%

By shifting tool presetting offline and introducing zero-point fixtures, our spindle utilization rose from 54% to 76%. We delivered orders faster than ever.

Director of Manufacturing, Precision Engineering Plant

KEY RESULTS

22%Spindle Utilization Uplift
38%CNC Setup Time Cut
96%On-Time Dispatch Rate

Services Delivered

  • OEE & Spindle Optimisation
  • SMED Setup Reduction
  • Industrial Engineering
  • Standardized Work
  • Tooling Systems

Methodologies Used

SMEDIndustrial EngineeringVisual Management5SStandardized Work
Service Capability

OEE Improvement

Maximize equipment availability, performance rate, and quality output on critical assets.

Ready to Achieve Similar Improvements?

Speak with our manufacturing consultants to discuss similar operational improvement opportunities for your plant.

Request a Manufacturing Assessment