Business Challenge

Heavy structural fabrication facility suffered from crisscrossing overhead crane movements, beam backtracking, and congested welding bays.

Client Situation & Operational Bottlenecks:

  • Structural steel traveling 3.2 km inside the plant during fabrication
  • Crisscrossing overhead crane movements creating severe material handling delays
  • Congested welding bays blocking structural assembly throughput
  • Long manufacturing lead times tying up working capital in heavy WIP inventory

Our Approach

  • Created detailed Spaghetti Diagrams tracking overhead crane and plate movement
  • Analyzed structural steel fabrication steps from cutting to final welding
  • Designed a unidirectional linear flow layout from plate cutting to dispatch
  • Established visual WIP buffer bays to regulate material flow between processes
  • Simulated crane utilization to eliminate crane travel bottlenecks

Key Improvement Initiatives

  • 1
    Relocated plate cutting machines and welding bays into a linear product bay
  • 2
    Created marked supermarket buffer zones for WIP beam storage
  • 3
    Implemented Kanban signaling for plate movement to welding bays
  • 4
    Trained bay supervisors on visual queue management and daily dispatch targets

Before vs. After Operational Metrics

MetricBefore TransformationAfter TransformationQuantified Impact
Fabrication Lead Time21 days14.7 days-30%
Material Travel Distance3.2 km1.7 km-47%
Floor Space Utilization58%84%+26%

The redesigned layout significantly improved production flow and reduced unnecessary movement across the shopfloor. Lead time dropped from 21 to 14.7 days.

Operations Head, Heavy Structural Fabrication Plant

KEY RESULTS

30%Lead Time Compression
45%Crane Movement Cut
7,000 sq.ftFloor Space Freed

Services Delivered

  • Plant Layout Optimisation
  • Material Flow Analysis
  • Industrial Engineering
  • WIP Inventory Control
  • Lean Manufacturing
  • Spaghetti Mapping

Methodologies Used

Factory Layout OptimisationSpaghetti DiagramsMaterial FlowKanban5S
Service Capability

Factory Layout Optimisation

Design lean, continuous-flow plant layouts that eliminate travel waste and maximize space.

Ready to Achieve Similar Improvements?

Speak with our manufacturing consultants to discuss similar operational improvement opportunities for your plant.

Request a Manufacturing Assessment