Primary Outcome35% Manpower Optimisation

Business Challenge

Heavy casting foundry suffered from high contract headcount dependency, manual flask handling delays, and poor spatial layout.

Client Situation & Operational Bottlenecks:

  • High contract labor dependency causing high conversion cost inflation
  • Heavy manual lifting of moulding flasks resulting in worker fatigue and injuries
  • 40% non-value-added movement due to disorganized sand moulding and pouring bays
  • Uneven mould setting cycle times leading to molten metal cooling losses

Our Approach

  • Executed Day-In-The-Life-Of (DILO) studies for moulding crews and furnace teams
  • Mapped worker travel paths and ergonomics using motion economy principles
  • Designed low-cost pneumatic hoists and gravity chutes for flask handling (LCIA)
  • Redesigned moulding shop layout into cellular work bays by casting weight
  • Created standardized work sheets for core setting and mould assembly

Key Improvement Initiatives

  • 1
    Relocated core setting stations adjacent to moulding bays to eliminate travel
  • 2
    Installed pneumatic assist hoists for effortless flask lifting and closing
  • 3
    Rebalanced moulding crew sizes from 8 to 5 operators per bay
  • 4
    Deployed Daily Management Systems with shift handover KPI scorecards

Before vs. After Operational Metrics

MetricBefore TransformationAfter TransformationQuantified Impact
Mould Shop Headcount180 operators117 operators-35%
Casting Output / Operator-Hr0.45 MT0.72 MT+60%
Mould Assembly Time45 min28 min-37%

The industrial engineering work and low-cost hoists transformed our foundry floor. We reduced contract headcount by 35% while increasing casting output.

Plant Head, Automotive Casting Foundry

KEY RESULTS

35%Manpower Optimised
60%Casting Output / Operator
37%Mould Cycle Time Cut

Services Delivered

  • Industrial Engineering
  • Manpower Optimisation
  • Low Cost Automation (LCIA)
  • Factory Layout Optimisation
  • Standardized Work

Methodologies Used

Industrial EngineeringMOSTLow Cost Automation5SKaizenErgonomics
Service Capability

Industrial Engineering

Scientific time-and-motion analysis to optimize work content, ergonomics, and productivity.

Ready to Achieve Similar Improvements?

Speak with our manufacturing consultants to discuss similar operational improvement opportunities for your plant.

Request a Manufacturing Assessment