Case StudiesAutomotive
Automotive Industry

Assembly Line Balancing & Layout Optimisation

Automotive Assembly Line Balancing & Layout Optimisation
Primary Outcome35% Productivity Improvement

Business Challenge

Uneven work allocation across 14 sub-assembly stations caused severe line starvation, operator idle time, and low daily throughput.

Client Situation & Operational Bottlenecks:

  • Excessive operator movement and material handling backtracking between stations
  • High line balance delay causing 40% waiting time on bottleneck workstations
  • Congested sub-assembly area restricting forklift material feeding
  • Inconsistent cycle times ranging from 45 to 120 seconds per workstation

Our Approach

  • Conducted Current State Value Stream Mapping (VSM) and Line Balance Audit
  • Executed MOST (Maynard Operation Sequence Technique) time-and-motion studies
  • Created Spaghetti Diagrams to track operator travel routes and material movement
  • Designed Yamazumi charts to redistribute work elements equally to Takt time
  • Developed Future State U-shaped cellular workstation layout
  • Simulated line flow and implemented gravity-fed material presentation chutes

Key Improvement Initiatives

  • 1
    Rebalanced 14 assembly workstations to a uniform 78-second Takt time pace
  • 2
    Installed ergonomic part presentation racks and Poka-Yoke sensor fixtures
  • 3
    Implemented visual line management boards and hour-by-hour production tracking
  • 4
    Trained shift supervisors on Standard Work auditing and Daily Management Systems

Before vs. After Operational Metrics

MetricBefore TransformationAfter TransformationQuantified Impact
Line Balance Efficiency62%95%+33%
Assembly Cycle Time120 sec78 sec35% faster
Material Handling Distance1,450 m / shift1,044 m / shift-28%
Daily Line Output240 units365 units+52%

The line rebalancing and layout redesign dramatically improved production pace. We eliminated operator waiting time and achieved our highest daily throughput without adding headcount.

Operations Head, Automotive Tier-1 Manufacturer

KEY RESULTS

35%Productivity Improvement
28%Material Travel Reduced
95%Line Balance Efficiency

Services Delivered

  • Plant Layout Optimisation
  • Line Balancing
  • Industrial Engineering
  • Material Flow Analysis
  • Lean Manufacturing
  • Motion Study

Methodologies Used

Lean ManufacturingLine BalancingMOSTVSM5SStandardized WorkSpaghetti Diagram
Service Capability

Line Balancing

Distribute work content evenly across assembly lines to eliminate idle time and bottlenecks.