Steel Industry
Plate Mill Capacity Optimisation

Primary Outcome30% Throughput Improvement
Business Challenge
Severe throughput bottlenecks at plate shearing lines and uncoordinated reheating schedules restricted total plant volume.
Client Situation & Operational Bottlenecks:
- •Hot rolling mill starved of reheated slabs due to uncoordinated furnace sequencing
- •Plate shearing line operating as severe constraint bottleneck causing slab cooling delays
- •WIP inventory buildup between billet casting and finishing dispatch yards
- •High energy consumption and furnace thickness changeover downtime
Our Approach
- Executed End-to-End Material Velocity and Bottleneck Capacity Audit
- Applied Theory of Constraints (TOC) to identify physical plant bottlenecks
- Modeled Drum-Buffer-Rope (DBR) schedule for furnace heating and rolling
- Designed slab sequencing rules to minimize furnace thickness changes
- Standardized shearing bed staging and cooling yard buffer management
Key Improvement Initiatives
- 1Implemented Drum-Buffer-Rope scheduling software cadence for reheating furnaces
- 2Sub-optimized non-bottleneck processes to ensure 100% feeding of hot rolling mill
- 3Established visual buffer management indicators across cooling beds and shearing lines
- 4Rolled out hourly bottleneck output tracking and downtime escalation routines
Before vs. After Operational Metrics
| Metric | Before Transformation | After Transformation | Quantified Impact |
|---|---|---|---|
| Order Lead Time | 14 days | 9.8 days | -30% |
| Mill Bottleneck Utilization | 64% | 91% | +27% |
| Monthly Plate Volume | 42,000 MT | 54,600 MT | +30% |
“
Pinnacle Logic identified hidden capacity in our mill that we didn't know existed. Unlocking 30% additional output without purchasing new machinery saved us crores in Capex.
— General Manager - Operations, Integrated Steel Manufacturer
KEY RESULTS
30%Throughput Uplift
30%Lead Time Compression
27%Spindle Utilization
Services Delivered
- Capacity Improvement
- Theory of Constraints
- Production Planning
- Material Velocity Mapping
- Industrial Engineering
Methodologies Used
Theory of ConstraintsDrum-Buffer-RopeVSMIndustrial EngineeringKaizen
Service Capability
Capacity Improvement
Unlock hidden plant capacity and expand output without expensive machinery Capex.
Ready to Achieve Similar Improvements?
Speak with our manufacturing consultants to discuss similar operational improvement opportunities for your plant.
Request a Manufacturing Assessment