Case StudiesSteel
Steel Industry

Plate Mill Capacity Optimisation

Steel Plate Mill Capacity Optimisation
Primary Outcome30% Throughput Improvement

Business Challenge

Severe throughput bottlenecks at plate shearing lines and uncoordinated reheating schedules restricted total plant volume.

Client Situation & Operational Bottlenecks:

  • Hot rolling mill starved of reheated slabs due to uncoordinated furnace sequencing
  • Plate shearing line operating as severe constraint bottleneck causing slab cooling delays
  • WIP inventory buildup between billet casting and finishing dispatch yards
  • High energy consumption and furnace thickness changeover downtime

Our Approach

  • Executed End-to-End Material Velocity and Bottleneck Capacity Audit
  • Applied Theory of Constraints (TOC) to identify physical plant bottlenecks
  • Modeled Drum-Buffer-Rope (DBR) schedule for furnace heating and rolling
  • Designed slab sequencing rules to minimize furnace thickness changes
  • Standardized shearing bed staging and cooling yard buffer management

Key Improvement Initiatives

  • 1
    Implemented Drum-Buffer-Rope scheduling software cadence for reheating furnaces
  • 2
    Sub-optimized non-bottleneck processes to ensure 100% feeding of hot rolling mill
  • 3
    Established visual buffer management indicators across cooling beds and shearing lines
  • 4
    Rolled out hourly bottleneck output tracking and downtime escalation routines

Before vs. After Operational Metrics

MetricBefore TransformationAfter TransformationQuantified Impact
Order Lead Time14 days9.8 days-30%
Mill Bottleneck Utilization64%91%+27%
Monthly Plate Volume42,000 MT54,600 MT+30%

Pinnacle Logic identified hidden capacity in our mill that we didn't know existed. Unlocking 30% additional output without purchasing new machinery saved us crores in Capex.

General Manager - Operations, Integrated Steel Manufacturer

KEY RESULTS

30%Throughput Uplift
30%Lead Time Compression
27%Spindle Utilization

Services Delivered

  • Capacity Improvement
  • Theory of Constraints
  • Production Planning
  • Material Velocity Mapping
  • Industrial Engineering

Methodologies Used

Theory of ConstraintsDrum-Buffer-RopeVSMIndustrial EngineeringKaizen
Service Capability

Capacity Improvement

Unlock hidden plant capacity and expand output without expensive machinery Capex.

Ready to Achieve Similar Improvements?

Speak with our manufacturing consultants to discuss similar operational improvement opportunities for your plant.

Request a Manufacturing Assessment